Sewer Installation Fee
The City of Sunnyside does not install sewer services. Work must be done by a licensed contractor. Sewer connection equity fees are charged according to the following schedule for connecting to the city’s sanitary sewer.
Equity Fee Schedule
Residential
- Single-family residential dwelling unit: $400
- Duplex and multi-dwelling unit, apartment, mobile home park: $450 basic equity fee plus $.08 per foot of living space.
Commercial
- $450 basic equity fee plus $.05 per square foot of building floor space
- Increases in building floor space shall result in an additional charge of $.05 per square foot for the additional building floor space
Industrial
- $450 basic equity fee plus $.10 per square foot of the building or structure to which the sewer connection is being made
- Increases in building floor space shall result in an additional charge of $.10 per square foot for the additional building floor space